(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Steel Pipe, Screw-in Pipe Fitting, Steel Socket (Standard Product) (Part Numbers)

Steel Pipe, Screw-in Pipe Fitting, Steel Socket (Standard Product)

NAGOYA, screw-in fitting / threaded type flange, steel pipe screw-in pipe fitting, steel socket. (Standard Product)

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
BS6A
BS8A
BS10A
BS15A
BS20A
BS25A
BS32A
BS40A
BS50A
BS65A
BS80A
BS100A
BS125A
BS150A
WS6A
WS8A
WS10A
WS15A
WS20A
WS25A
WS32A
WS40A
WS50A
WS65A
WS80A
WS100A
WS125A
WS150A
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment Dimension L
(mm)

SGD 4.28

1 Piece(s) 7 Day(s) or more 1/8B(6A)Black Oxide Coating19

SGD 4.65

1 Piece(s) 4 Day(s) or more 1/4B(8A)Black Oxide Coating27

SGD 5.27

1 Piece(s) 7 Day(s) or more 3/8B(10A)Black Oxide Coating28

SGD 7.07

1 Piece(s) 7 Day(s) or more 1/2B(15A)Black Oxide Coating37

SGD 7.82

1 Piece(s) 7 Day(s) or more 3/4B(20A)Black Oxide Coating39

SGD 9.48

1 Piece(s) 7 Day(s) or more 1B(25A)Black Oxide Coating46

SGD 11.17

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Black Oxide Coating51

SGD 13.34

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Black Oxide Coating51

SGD 15.99

1 Piece(s) 4 Day(s) or more 2B(50A)Black Oxide Coating60

SGD 26.25

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Black Oxide Coating69

SGD 32.82

1 Piece(s) 7 Day(s) or more 3B(80A)Black Oxide Coating75

SGD 50.66

1 Piece(s) 7 Day(s) or more 4B(100A)Black Oxide Coating87

SGD 78.90

1 Piece(s) 7 Day(s) or more 5B(125A)Black Oxide Coating96

SGD 108.07

1 Piece(s) 7 Day(s) or more 6B(150A)Black Oxide Coating96

SGD 5.02

1 Piece(s) 10 Day(s) or more 1/8B(6A)Zinc Plating19

SGD 5.24

1 Piece(s) 10 Day(s) or more 1/4B(8A)Zinc Plating27

SGD 6.33

1 Piece(s) 10 Day(s) or more 3/8B(10A)Zinc Plating28

SGD 7.74

1 Piece(s) 10 Day(s) or more 1/2B(15A)Zinc Plating37

SGD 8.73

1 Piece(s) 10 Day(s) or more 3/4B(20A)Zinc Plating39

SGD 11.03

1 Piece(s) 10 Day(s) or more 1B(25A)Zinc Plating46

SGD 13.21

1 Piece(s) 10 Day(s) or more 1 1/4B(32A)Zinc Plating51

SGD 15.91

1 Piece(s) 10 Day(s) or more 1 1/2B(40A)Zinc Plating51

SGD 20.17

1 Piece(s) 10 Day(s) or more 2B(50A)Zinc Plating60

SGD 32.13

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Zinc Plating69

SGD 41.53

1 Piece(s) 10 Day(s) or more 3B(80A)Zinc Plating75

SGD 64.33

1 Piece(s) 10 Day(s) or more 4B(100A)Zinc Plating87

SGD 91.91

1 Piece(s) 10 Day(s) or more 5B(125A)Zinc Plating96

SGD 127.59

1 Piece(s) 10 Day(s) or more 6B(150A)Zinc Plating96

Loading...

  1. 1

Basic Information

Connecting Shape Socket Connection Type Screw⇔Screw Same Diameter・Different Type Material Steel
Connection Thread Type M1 G (Tapped) Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2 Divisions of Max. Operating Pressure 2.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Vapor/Air/Gas/Oil/Pulsating Flow which is 220℃ or Less)(MPa) 1.4 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.0

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)