(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
For connecting low-pressure pipes and drain/ventilation pipes.
[Features]
·Secondary processing of piping is not required.
·Can be installed with a single torque wrench.
·Piping connections in narrow spaces are possible.
·It is cheaper than conventional products.
Japanese Only
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Applicable Plumbing | Applicable Fluid | Nominal Diameter (A) | Maximum Operating Pressure (MPa) | Rubber Sealing Material | Material of Bolt |
---|---|---|---|---|---|---|---|---|---|---|
SGD 28.85 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3/4B(20A) | 1.0 | EPDM | SCM435 | ||
SGD 43.95 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3/4B(20A) | 1.0 | EPDM | SUS304 | ||
SGD 28.85 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3/4B(20A) | 1.0 | NBR | SCM435 | ||
SGD 43.95 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3/4B(20A) | 1.0 | NBR | SUS304 | ||
SGD 29.44 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1B(25A) | 1.0 | EPDM | SCM435 | ||
SGD 44.56 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1B(25A) | 1.0 | EPDM | SUS304 | ||
SGD 44.56 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1B(25A) | 1.0 | NBR | SUS304 | ||
SGD 30.06 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1 1/4B(32A) | 1.0 | EPDM | SCM435 | ||
SGD 45.15 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water | 1 1/4B(32A) | 1.0 | EPDM | SUS304 | ||
SGD 30.06 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1 1/4B(32A) | 1.0 | NBR | SCM435 | ||
SGD 45.15 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe | Water / Oils and Fats | 1 1/4B(32A) | 1.0 | NBR | SUS304 | ||
SGD 30.65 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 1 1/2B(40A) | 1.0 | EPDM | SCM435 | ||
SGD 47.70 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 1 1/2B(40A) | 1.0 | EPDM | SUS304 | ||
SGD 30.65 | 1 Piece(s) | 9 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 1 1/2B(40A) | 1.0 | NBR | SCM435 | ||
SGD 47.70 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 1 1/2B(40A) | 1.0 | NBR | SUS304 | ||
SGD 39.48 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2B(50A) | 1.0 | EPDM | SCM435 | ||
SGD 56.52 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2B(50A) | 1.0 | EPDM | SUS304 | ||
SGD 56.52 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2B(50A) | 1.0 | NBR | SUS304 | ||
SGD 50.23 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2 1/2B(65A) | 0.7 | EPDM | SCM435 | ||
SGD 76.55 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 2 1/2B(65A) | 0.7 | EPDM | SUS304 | ||
SGD 50.23 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2 1/2B(65A) | 0.7 | NBR | SCM435 | ||
SGD 76.55 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 2 1/2B(65A) | 0.7 | NBR | SUS304 | ||
SGD 61.46 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3B(80A) | 0.7 | EPDM | SCM435 | ||
SGD 87.91 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 3B(80A) | 0.7 | EPDM | SUS304 | ||
SGD 61.46 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 3B(80A) | 0.7 | NBR | SCM435 | ||
SGD 89.10 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 4B(100A) | 0.5 | EPDM | SCM435 | ||
SGD 120.50 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 4B(100A) | 0.5 | EPDM | SUS304 | ||
SGD 89.10 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 4B(100A) | 0.5 | NBR | SCM435 | ||
SGD 120.50 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 4B(100A) | 0.5 | NBR | SUS304 | ||
SGD 125.58 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 5B(125A) | 0.3 | EPDM | SCM435 | ||
SGD 156.99 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 5B(125A) | 0.3 | EPDM | SUS304 | ||
SGD 156.99 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 5B(125A) | 0.3 | NBR | SUS304 | ||
SGD 163.25 | 1 Piece(s) | 7 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 6B(150A) | 0.3 | EPDM | SCM435 | ||
SGD 194.65 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 6B(150A) | 0.3 | EPDM | SUS304 | ||
SGD 163.25 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 6B(150A) | 0.3 | NBR | SCM435 | ||
SGD 194.65 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 6B(150A) | 0.3 | NBR | SUS304 | ||
SGD 257.45 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 8B(200A) | 0.3 | EPDM | SCM435 | ||
SGD 310.05 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water | 8B(200A) | 0.3 | EPDM | SUS304 | ||
SGD 257.45 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 8B(200A) | 0.3 | NBR | SCM435 | ||
SGD 310.05 | 1 Piece(s) | 6 Day(s) or more | Carbon Steel Pipes / Stainless Steel Pipe / Hard PVC Pipe | Water / Oils and Fats | 8B(200A) | 0.3 | NBR | SUS304 |
Loading...
Type | Joint | Body Material | Stainless Steel | Tightening Bolt Type | Hexagon socket head bolt |
---|
How can we improve?
How can we improve?