(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Straub with Grip, 316 Type (Part Numbers)

Straub with Grip, 316 Type

Lightweight and low cost mechanical pipe fitting with excellent corrosion resistance.

[Features]
· Low cost was achieved by simplifying the components while adopting SUS316, which is highly resistant to rust and other corrosion, for the main body (U bar structure is patented).
· Compact and lighter than other fittings in spite of high performance.
· Therefore, construction in narrow work spaces is easy.
· Secondary processing such as threading and grooving is not required at all due to unique a structure that prevents pipe disconnection, thus enabling reductions in processing cost and working time.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
316-20E
316-20N
316-25E
316-25N
316-32E
316-32N
316-40E
316-40N
316-50E
316-50N
316-65E
316-65N
316-80E
316-80N
316-100E
316-100N
316-125E
316-125N
316-150E
316-150N
316-200E
316-200N
316B-20E
316B-20N
316B-25E
316B-25N
316B-32E
316B-32N
316B-40E
316B-40N
316B-50E
316B-50N
316B-65E
316B-65N
316B-80E
316B-80N
316B-100E
316B-100N
316B-125E
316B-125N
316B-150E
316B-150N
316B-200E
316B-200N
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipApplicable Plumbing Applicable Fluid Nominal Diameter Maximum Pressure Gas used [There are limites in the usage condition]
(MPa)
Rubber Sleeve Material Inner Plate

SGD 68.16

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical20A1.6EPDMNo

SGD 65.23

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats20A1.6NBRNo

SGD 68.87

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical25A1.6EPDMNo

SGD 67.58

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats25A1.6NBRNo

SGD 68.70

1 Piece(s) 5 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical32A1.6EPDMNo

SGD 69.92

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats32A1.6NBRNo

SGD 72.17

1 Piece(s) 5 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical40A1.6EPDMNo

SGD 73.45

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats40A1.6NBRNo

SGD 81.17

1 Piece(s) 4 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical50A1.6EPDMNo

SGD 79.31

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats50A1.6NBRNo

SGD 103.29

1 Piece(s) 5 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical65A1.6EPDMNo

SGD 105.14

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats65A1.6NBRNo

SGD 113.35

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical80A1.6EPDMNo

SGD 113.35

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats80A1.6NBRNo

SGD 125.09

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical100A1.6EPDMNo

SGD 125.09

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats100A1.6NBRNo

SGD 199.03

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical125A1.6EPDMNo

SGD 199.03

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats125A1.6NBRNo

SGD 255.37

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical150A1.3EPDMNo

SGD 255.37

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats150A1.3NBRNo

SGD 518.28

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical200A1.0EPDMNo

SGD 518.28

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats200A1.0NBRNo

SGD 71.10

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical20A1.6EPDMEquipped Products

SGD 71.10

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats20A1.6NBREquipped Products

SGD 74.61

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical25A1.6EPDMEquipped Products

SGD 74.61

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats25A1.6NBREquipped Products

SGD 76.97

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Chemical32A1.6EPDMEquipped Products

SGD 76.97

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel PipeWater / Air / Organic Gas / Oils and Fats32A1.6NBREquipped Products

SGD 81.07

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical40A1.6EPDMEquipped Products

SGD 81.07

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats40A1.6NBREquipped Products

SGD 88.12

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical50A1.6EPDMEquipped Products

SGD 88.12

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats50A1.6NBREquipped Products

SGD 114.52

1 Piece(s) 8 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical65A1.6EPDMEquipped Products

SGD 114.52

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats65A1.6NBREquipped Products

SGD 123.32

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical80A1.6EPDMEquipped Products

SGD 123.32

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats80A1.6NBREquipped Products

SGD 136.83

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical100A1.6EPDMEquipped Products

SGD 136.83

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats100A1.6NBREquipped Products

SGD 211.35

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical125A1.6EPDMEquipped Products

SGD 211.35

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats125A1.6NBREquipped Products

SGD 268.28

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical150A1.3EPDMEquipped Products

SGD 268.28

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats150A1.3NBREquipped Products

SGD 539.41

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Chemical200A1.0EPDMEquipped Products

SGD 539.41

1 Piece(s) 7 Day(s) or more Steel pipe / Stainless Steel Pipe / PVC PipeWater / Air / Organic Gas / Oils and Fats200A1.0NBREquipped Products

Loading...

  1. 1

Basic Information

Type Joint Casing Material SUS316 Tightening Bolt Type Hexagon socket head bolt

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)