(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Suspension Pipe Bracket Piping with TNF Tongue (Electrogalvanized/Stainless Steel) (Part Numbers)

Suspension Pipe Bracket Piping with TNF Tongue (Electrogalvanized/Stainless Steel)

Hinge-type Hanging Band for Fire-resistant Dual Pipes (FDP) * Catalog CorrectionPipe outer diameter for A16000-0040 compatibility is listed as 69 but it is actually 89.

[Features]
• "A14203TNF without tongue" comes in a set with "A10312 turnbuckle."
• Zinc Plating Finish

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A14204-0017
A14204-0021
A14204-0036
A14204-0055
A14204-0060
A14204-0093
A14204-0106
A14204-0125
A14204-0130
A16000-0016
A16000-0035
A16000-0040
A16000-0054
A16000-0069
A16000-0073
A16000-0088
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Surface Treatment Size Compatible Pipe Outer Diameter
(mm)

SGD 2.95

1 Piece(s) 4 Day(s) or more 60~Less than 70Steel[Zinc Plating] Electrolytic Zinc Plating4060~61

SGD 2.08

1 Piece(s) 6 Day(s) or more 70~Less than 80Steel[Zinc Plating] Electrolytic Zinc Plating5073

SGD 3.17

1 Piece(s) 6 Day(s) or more 80~Less than 90Steel[Zinc Plating] Electrolytic Zinc Plating6589

SGD 2.37

1 Piece(s) 6 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating75102

SGD 2.86

1 Piece(s) 6 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating100128~129

SGD 10.24

1 Piece(s) 4 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating125155~156

SGD 10.62

1 Piece(s) 9 Day(s) or more 100~Less than 200Steel[Zinc Plating] Electrolytic Zinc Plating150183

SGD 3.21

1 Piece(s) 4 Day(s) or more 40~Less than 50Steel[Zinc Plating] Electrolytic Zinc Plating2545

SGD 3.21

1 Piece(s) 4 Day(s) or more 50~Less than 60Steel[Zinc Plating] Electrolytic Zinc Plating3051

SGD 13.05

1 Piece(s) 4 Day(s) or more 60~Less than 70[Stainless] Stainless SteelNo4060~61

SGD 13.51

1 Piece(s) 7 Day(s) or more 70~Less than 80[Stainless] Stainless SteelNo5073

SGD 14.02

1 Piece(s) 7 Day(s) or more 80~Less than 90[Stainless] Stainless SteelNo6589

SGD 14.54

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo75102

SGD 15.28

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo100128~129

SGD 37.66

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo125155~156

SGD 43.42

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless SteelNo150183

Loading...

  1. 1

Basic Information

Type Hanging Band Applicable Tube Type Fire Resistant Dual Pipes Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)