(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Manifold Blocks(Shape:Vertical Through Hole)

Shape

  • Vertical Semi-Through Hole, Upper Hole
  • Vertical Through Hole
  • T-Shaped Hole
  • Blind Lateral Hole, Upper Hole
  • Blind Lateral Hole, Vertical Semi-Through Hole
  • Blind Lateral Hole, L-Shaped Hole
  • Blind Lateral Hole, Two-Circuit (Upper Hole)
  • Blind Lateral Hole, Two-Circuit (Vertical Semi-Through Hole)
  • Blind Lateral Hole, Two-Circuit (L-Shaped Hole)
  • Lateral Through Hole, Upper Hole
  • Lateral Through Hole, Vertical Semi-Through Hole
  • Lateral Through Hole, Vertical Through Hole
  • Lateral Through Hole, T-Shaped Hole
  • Lateral Through Hole, L-Shaped Hole
  • Lateral Through Hole, Upper Hole (Double)
  • Lateral Through Hole, L-Shaped Hole (Double)
  1. 1
Brand
Product Series
CAD
Days to Ship
Shape
Environmentally friendly
Material
Characteristics/Applications
Surface Treatment
Cleaning Method

    Terminal Blocks - Pneumatic - Vertical Through Hole

      Manifold Blocks - Hydraulic - Lateral Through Hole, Upper Hole

        Block Terminal for Hydraulic/Water/Air -Vertical Through Hole Type-

          [Clean & Pack] Terminal Block - Hydraulic, Vertical Through Hole

            Terminal Blocks - Hydraulic - Vertical Through Hole

            Brand

            MISUMI

            MISUMI

            MISUMI

            MISUMI

            MISUMI

            Product Series

            Terminal Blocks - Pneumatic - Vertical Through Hole

            Manifold Blocks - Hydraulic - Lateral Through Hole, Upper Hole

            Block Terminal for Hydraulic/Water/Air -Vertical Through Hole Type-

            [Clean & Pack] Terminal Block - Hydraulic, Vertical Through Hole

            Terminal Blocks - Hydraulic - Vertical Through Hole

            CAD
            • 2D / 3D
            • 2D / 3D
            • 2D / 3D
            • 2D / 3D
            • 2D / 3D
            Days to Ship 5 Day(s) or more 6 Day(s) or more 4 Day(s) or more 9 Day(s) or more 5 Day(s) or more
            ShapeVertical Through HoleVertical Through HoleVertical Through HoleVertical Through HoleVertical Through Hole
            Environmentally friendly---RoHS Compliant (10 Substances)-
            MaterialA5052 / Aluminum AlloySS400 / SUS304 / Brass / Steel for General StructureSUS304 / SS400 / Aluminum AlloySUS304 / SUS316SS400 / SUS304 / SUS316 / Brass / Steel for General Structure
            Characteristics/Applications---Clean Washed-
            Surface TreatmentNot Provided / Clear AnodizeNot Provided / Trivalent Chromate / Electroless Nickel PlatingNot Provided / Trivalent ChromateNot ProvidedNot Provided / Trivalent Chromate / Electroless Nickel Plating
            Cleaning Method---Degreasing / Precision Cleaning / Electrolytic Polishing + Precision Cleaning-

            Loading...

            1. 1

            Related Categories to Manifold Blocks