(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

SHINOHARA ELECTRIC Packing

Days to Ship
  • All
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 10 Day(s) or Less
  • 12 Day(s) or Less
  • 13 Day(s) or Less
  • 18 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Material
Dimension: Thickness/Depth(mm)

    Sponge Packing (D / SD / SS Sponge)

      Inset Packing

        Groove Rubber

          H-Shaped Rubber Packing

            Edging (Cable Protection Packing)

              Straight Packing

              Brand

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              SHINOHARA ELECTRIC

              Product Series

              Sponge Packing (D / SD / SS Sponge)【1-5 Pieces Per Package】

              Inset Packing

              Groove Rubber

              H-Shaped Rubber Packing

              Edging (Cable Protection Packing)【50 Pieces Per Package】

              Straight Packing

              CAD
              • 2D
              • 2D
              Days to Ship 4 Day(s) or more 4 Day(s) or more 4 Day(s) or more 4 Day(s) or more 4 Day(s) or more 4 Day(s) or more
              MaterialChloroprene RubberChloroprene Rubber / EPDMEPDM / PVCPVC-Natural Rubber + Chloroprene Rubber Coating
              Dimension: Thickness/Depth(mm)3 ~ 511.5 ~ 33.56 ~ 814 ~ 203.3 ~ 5.33 ~ 5

              Loading...

              1. 1

              Related Categories to Packing