(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

MISUMI X-Axis(Stroke (X Distance):±12.5)

Days to Ship
  • All
  • Same day
  • 3 Day(s) or Less
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 7 Day(s) or Less
  • 8 Day(s) or Less
  • 11 Day(s) or Less
  • 18 Day(s) or Less
  1. 1
Brand
Product Series
CAD
Days to Ship
Load Capacity (Range)(N)
Table Size (Width) W(mm)
Table Size (Length) L(mm)
Table Material
Feeding Method
Stroke (X Distance)(mm)
Table Surface Treatment
Travel Guide
Table Size (Thickness) H(mm)
Clamp

    [Simplifi ed Adjustments] X-Axis, Feed Screw, Side Clamp Units / Key Guide Units - Accuracy Standards

    Brand

    MISUMI

    Product Series

    [Simplifi ed Adjustments] X-Axis, Feed Screw, Side Clamp Units / Key Guide Units - Accuracy Standards

    CAD
    • 2D / 3D
    Days to Ship 4 Day(s) or more
    Load Capacity (Range)(N)5~30
    Table Size (Width) W(mm)29
    Table Size (Length) L(mm)50
    Table MaterialAluminum
    Feeding MethodFeed Screw
    Stroke (X Distance)(mm)±12.5
    Table Surface TreatmentBlack Anodize
    Travel GuideSlide Guide
    Table Size (Thickness) H(mm)21.5
    ClampHex Socket Head Cap Screw

    Loading...

    1. 1

    Related Categories to X-Axis