(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Switch Boxes(Representative Standard:CUL)

Days to Ship
  • All
  • Same day
  • 4 Day(s) or Less
  • 5 Day(s) or Less
  • 6 Day(s) or Less
  • 9 Day(s) or Less
  • 12 Day(s) or Less
  1. 1
Brand
Product Series
Days to Ship
Material
Dimension width W(mm)
Dimension vertical H(mm)
Dimension depth D(mm)
Protection function (environmentally resistant)
Intermediate plate
Installation
Representative Standard

    FB Series Plastic Control Box

    Brand

    IDEC

    Product Series

    FB Series Plastic Control Box

    Days to Ship 5 Day(s) or more
    MaterialResin
    Dimension width W(mm)76
    Dimension vertical H(mm)76 ~ 200
    Dimension depth D(mm)59.5
    Protection function (environmentally resistant)IP65
    Intermediate plateNot Specified
    InstallationNot Specified
    Representative StandardCUL

    Loading...

    1. 1

    Related Categories to Switch Boxes