(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Energy Meter / Instrument Box Mounting Plate (BP-3LB)

Energy Meter / Instrument Box Mounting Plate BP-3LB

Click this image to zoom it.

Move the mouse over the image to zoom

[Features]
· Can be mounted to pole bands.
For the BP-2U model, band through-holes (10‑mm wide) are provided for securing onto fixtures such as poles using stainless steel bands.

PDF

Part Number

Configured Part Number is shown.

BP-3LB

 
Part Number
BP-3LB
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipColor Compatible watt-hour meter ø1 2 W
(A)
Compatible watt-hour meter ø1 (ø3) 3 W
(A)
Compatible instrument box

SGD 36.20

1 Piece(s) 8 Day(s) or more Light brownUp to 120 AUp to 120 ASingle-phase large, three-phase small (M), three-phase large (L)

Loading...

  1. 1

Basic Information

Type Mounting Plate

Please check the type/dimensions/specifications of the part BP-3LB in the Energy Meter / Instrument Box Mounting Plate series.

Similar Part Numbers

Part Number
BP-0LB
BP-0LDG
BP-0LG
BP-3M
BP-3WDG
BP-3WG
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipColor Compatible watt-hour meter ø1 2 W
(A)
Compatible watt-hour meter ø1 (ø3) 3 W
(A)
Compatible instrument box

SGD 13.68

1 Piece(s) 7 Day(s) or more Light brown30 A-Single-phase small (S)

SGD 18.10

1 Piece(s) 7 Day(s) or more Dark gray30 A--

SGD 18.10

1 Piece(s) 7 Day(s) or more Gray30 A--

SGD 36.20

1 Piece(s) 8 Day(s) or more Milky whiteUp to 120 AUp to 120 ASingle-phase large, three-phase small (M), three-phase large (L)

SGD 61.73

1 Piece(s) 8 Day(s) or more Dark grayUp to 120 AUp to 120 ASingle-phase large, three-phase small (M), three-phase large (L)

SGD 61.73

1 Piece(s) 8 Day(s) or more GrayUp to 120 AUp to 120 ASingle-phase large, three-phase small (M), three-phase large (L)

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)