(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Malleable Cast Iron Pipe Fitting, Union (Standard) (U-B-21/2)

Screw-In Malleable Cast Iron Pipe Fitting, Union (Standard) U-B-21/2

[Features]
・ RING Brand fittings are products produced with state-of-the-art equipment and thorough quality control
・ The RING Brand PL fitting has a powder epoxy resin coated on its inner and outer surfaces by a special coating method, excluding the threaded section, and has excellent adhesion, corrosion resistance, etc.
・ Both products are safe to use

PDF

Japanese Only

Part Number

Configured Part Number is shown.

U-B-21/2

 
Part Number
U-B-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 96.65

1 Piece(s) 8 Day(s) or more 2 1/2B(65A)No

Loading...

  1. 1

Basic Information

Connecting Shape Union Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Please check the type/dimensions/specifications of the part U-B-21/2 in the Screw-In Malleable Cast Iron Pipe Fitting, Union (Standard) series.

Similar Part Numbers

Part Number
U-B-11/2
U-B-11/4
U-B-2
U-B-3
U-B-3/4
U-B-3/8
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 30.94

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)No

SGD 23.24

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)No

SGD 45.98

1 Piece(s) 8 Day(s) or more 2B(50A)No

SGD 123.32

1 Piece(s) 8 Day(s) or more 3B(80A)No

SGD 11.96

1 Piece(s) 8 Day(s) or more 3/4B(20A)No

SGD 11.56

1 Piece(s) 8 Day(s) or more 3/8B(10A)No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)