(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Screw-In Malleable Cast Iron Pipe Fitting, Plug

Screw-In Malleable Cast Iron Pipe Fitting, Plug

[Features]
・ RING Brand fittings are products produced with state-of-the-art equipment and thorough quality control
・ The RING Brand PL fitting has a powder epoxy resin coated on its inner and outer surfaces by a special coating method, excluding the threaded section, and has excellent adhesion, corrosion resistance, etc.
・ Both products are safe to use

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
P-W-1
P-W-1/2
P-W-1/4
P-W-1/8
P-W-2
P-W-3
P-W-3/4
P-W-4
P-W-5
P-W-6
P-W-11/2
P-W-11/4
P-W-21/2
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment

SGD 2.56

1 Piece(s) 8 Day(s) or more 1B(25A)Zinc Plating

SGD 2.04

1 Piece(s) 8 Day(s) or more 1/2B(15A)Zinc Plating

SGD 2.14

1 Piece(s) 8 Day(s) or more 1/4B(8A)Zinc Plating

SGD 2.14

1 Piece(s) 8 Day(s) or more 1/8B(6A)Zinc Plating

SGD 5.41

1 Piece(s) 8 Day(s) or more 2B(50A)Zinc Plating

SGD 14.71

1 Piece(s) 8 Day(s) or more 3B(80A)Zinc Plating

SGD 2.33

1 Piece(s) 8 Day(s) or more 3/4B(20A)Zinc Plating

SGD 26.75

1 Piece(s) 8 Day(s) or more 4B(100A)Zinc Plating

SGD 92.47

1 Piece(s) 8 Day(s) or more 5B(125A)Zinc Plating

SGD 127.23

1 Piece(s) 8 Day(s) or more 6B(150A)Zinc Plating

SGD 4.01

1 Piece(s) 8 Day(s) or more 1 1/2B(40A)Zinc Plating

SGD 3.44

1 Piece(s) 8 Day(s) or more 1 1/4B(32A)Zinc Plating

SGD 9.56

1 Piece(s) 8 Day(s) or more 2 1/2B(65A)Zinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape Plug Connection Type Pitch (Terminal) Material Cast Iron
Connection Thread Type M1 R Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 1 Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining No
Details of Max. Operating Pressure (Vapor/Air/Gas/Oil which is 300℃ or Less)(MPa) 1.0 Details of Max. Operating Pressure (Steady Flow which is 120℃ or Less)(MPa) 2.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)