(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug (P-150-C)

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug P-150-C

JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct threaded fittings.
[Features]
· Made in Japan.
[Applications]
·Ideal for ends to threaded fittings of white piping.

PDF

Part Number

Configured Part Number is shown.

P-150-C

 
Part Number
P-150-C
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 196.20

1 Piece(s) 7 Day(s) or more 6B(150A)WaterResin Coating

Loading...

  1. 1

Basic Information

Connecting Shape Plug Connection Type Pitch (Terminal) Material Cast Iron
Connection Thread Type M1 R Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Please check the type/dimensions/specifications of the part P-150-C in the Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug series.

Similar Part Numbers

Part Number
P-100-C
P-100-W
P-125-B
P-150-W
P-20-B
P-20-C
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 66.28

1 Piece(s) 7 Day(s) or more 4B(100A)WaterResin Coating

SGD 33.47

1 Piece(s) 7 Day(s) or more 4B(100A)Oil / Air / Water / GasZinc Plating

SGD 99.59

1 Piece(s) 7 Day(s) or more 5B(125A)Oil / Air / Water / Gas / SteamNo

SGD 123.96

1 Piece(s) 7 Day(s) or more 6B(150A)Oil / Air / Water / GasZinc Plating

SGD 5.81

1 Piece(s) 7 Day(s) or more 3/4B(20A)Oil / Air / Water / Gas / SteamNo

SGD 8.74

1 Piece(s) 7 Day(s) or more 3/4B(20A)WaterResin Coating

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)