(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Elbow

Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Elbow

JIS standard (B2301 screw-in type malleable cast iron pipe fittings) correct threaded fittings.
[Features]
·The appearance is exactly the same as the conventional product.
· Made in Japan.
[Applications]
·Ideal for 90° bends in white piping.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
L-6-B
L-6-W
L-8-B
L-8-W
L-10-B
L-10-W
L-15-B
L-15-W
L-20-B
L-20-W
L-25-B
L-25-W
L-32-B
L-32-W
L-40-B
L-40-W
L-50-B
L-50-W
L-65-B
L-65-W
L-80-B
L-80-W
L-100-B
L-100-W
L-125-B
L-125-W
L-150-B
L-150-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

SGD 6.18

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Steam / Gas / OilNo

SGD 5.83

1 Piece(s) 7 Day(s) or more 1/8B(6A)Water / Air / Gas / OilZinc Plating

SGD 6.18

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Steam / Gas / OilNo

SGD 5.83

1 Piece(s) 7 Day(s) or more 1/4B(8A)Water / Air / Gas / OilZinc Plating

SGD 6.18

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Steam / Gas / OilNo

SGD 5.83

1 Piece(s) 7 Day(s) or more 3/8B(10A)Water / Air / Gas / OilZinc Plating

SGD 4.43

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Steam / Gas / OilNo

SGD 3.84

1 Piece(s) 7 Day(s) or more 1/2B(15A)Water / Air / Gas / OilZinc Plating

SGD 5.51

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Steam / Gas / OilNo

SGD 5.26

1 Piece(s) 7 Day(s) or more 3/4B(20A)Water / Air / Gas / OilZinc Plating

SGD 6.83

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Steam / Gas / OilNo

SGD 6.39

1 Piece(s) 7 Day(s) or more 1B(25A)Water / Air / Gas / OilZinc Plating

SGD 9.41

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Steam / Gas / OilNo

SGD 8.59

1 Piece(s) 7 Day(s) or more 1 1/4B(32A)Water / Air / Gas / OilZinc Plating

SGD 10.58

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Steam / Gas / OilNo

SGD 9.60

1 Piece(s) 7 Day(s) or more 1 1/2B(40A)Water / Air / Gas / OilZinc Plating

SGD 13.87

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Steam / Gas / OilNo

SGD 12.42

1 Piece(s) 7 Day(s) or more 2B(50A)Water / Air / Gas / OilZinc Plating

SGD 25.55

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Steam / Gas / OilNo

SGD 22.43

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Water / Air / Gas / OilZinc Plating

SGD 36.18

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Steam / Gas / OilNo

SGD 32.73

1 Piece(s) 7 Day(s) or more 3B(80A)Water / Air / Gas / OilZinc Plating

SGD 60.62

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Steam / Gas / OilNo

SGD 54.86

1 Piece(s) 7 Day(s) or more 4B(100A)Water / Air / Gas / OilZinc Plating

SGD 172.88

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Steam / Gas / OilNo

SGD 156.41

1 Piece(s) 7 Day(s) or more 5B(125A)Water / Air / Gas / OilZinc Plating

SGD 238.93

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Steam / Gas / OilNo

SGD 216.15

1 Piece(s) 7 Day(s) or more 6B(150A)Water / Air / Gas / OilZinc Plating

Loading...

  1. 1

Basic Information

Connecting Shape 90° Elbow Connection Type Screw⇔Screw Same Diameter・Different Type Material Cast Iron
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)