(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
Brand-name products provided by MISUMI-VONA are offered based on customers' needs that selected from products of Asian manufacturers carefully. Please select an item according to the user's various usage scenes. The LI MING spares no expense in equipment investment, from manufacture to shipping. Ever since its establishment in 1969, the company has thoroughly implemented robust manufacturing systems. It is expanding with an emphasis on motors and gearboxes with superior power.
Japanese Only
Part Number
Configured Part Number is shown.
LM-LMW-70-1/50-W2-0.4KW
Part Number |
---|
LM-LMW-70-1/50-W2-0.4KW |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Reduction Ratio | Output Shaft Diameter (φ) | Motor Capacity (kW) | Output Shaft Placement | Input Shaft Dia. (φ) | Part Number | Input Mode | Output Mode |
---|---|---|---|---|---|---|---|---|---|---|---|---|
SGD 385.61 | 1 Piece(s) | 13 Day(s) | 50 | 28 | 0.4 | Left Side | 14 | 70 | Shaft/flange dual input/under input shaft installation | Horizontal axis uniaxial output/solid shaft |
Loading...
Mounting Class | Flange With Leg | Type | Worm Gear | With or Without Motors | No |
---|---|---|---|---|---|
Output Shaft Type | Solid | Output Shaft Shape | Shaft (with key groove) | Input shaft shape | Hole (with keyway) |
Input / output shaft orientation *See catalog | Crossing | Fixation Method | Bolt Fixation |
Please check the type/dimensions/specifications of the part LM-LMW-70-1/50-W2-0.4KW in the Worm decelerator - Lower worm type and output shaft solid - LM-LMW series.
Part Number |
---|
LM-LMW-60-1/10-W1-0.4KW |
LM-LMW-60-1/10-W2-0.4KW |
LM-LMW-60-1/10-WV-0.4KW |
LM-LMW-70-1/50-WV-0.4KW |
LM-LMW-70-1/60-L-0.4KW |
LM-LMW-70-1/60-R-0.4KW |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Reduction Ratio | Output Shaft Diameter (φ) | Motor Capacity (kW) | Output Shaft Placement | Input Shaft Dia. (φ) | Part Number | Input Mode | Output Mode |
---|---|---|---|---|---|---|---|---|---|---|---|---|
SGD 273.92 | 1 Piece(s) | 13 Day(s) | 10 | 22 | 0.4 | Right Side | 14 | 60 | Shaft/flange dual input/under input shaft installation | Horizontal axis uniaxial output/solid shaft | ||
SGD 273.92 | 1 Piece(s) | 13 Day(s) | 10 | 22 | 0.4 | Left Side | 14 | 60 | Shaft/flange dual input/under input shaft installation | Horizontal axis uniaxial output/solid shaft | ||
SGD 273.92 | 1 Piece(s) | 13 Day(s) | 10 | 22 | 0.4 | Input and Output Double Shaft | 14 | 60 | Shaft/flange dual input/under input shaft installation | Horizontal axis biaxial output/solid shaft | ||
SGD 385.61 | 1 Piece(s) | 13 Day(s) | 50 | 28 | 0.4 | Input and Output Double Shaft | 14 | 70 | Shaft/flange dual input/under input shaft installation | Horizontal axis biaxial output/solid shaft | ||
SGD 375.39 | 1 Piece(s) | 13 Day(s) | 60 | 28 | 0.4 | Left Side | 14 | 70 | Flange input/under input shaft installation | Horizontal axis uniaxial output/solid shaft | ||
SGD 375.39 | 1 Piece(s) | 13 Day(s) | 60 | 28 | 0.4 | Right Side | 14 | 70 | Flange input/under input shaft installation | Horizontal axis uniaxial output/solid shaft |
How can we improve?
How can we improve?