(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pulley 2GT

Pulley 2GT

Lead for 2GT type belt

[Features]
· Comes in a set of one cylindrical pulley and ten flanges.
· Individual flanges are not sold

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Japanese Only

Part Number 

CAD Data download and 3D preview are not available because the part number has not yet been determined.

  • *In order to open the CAD Data download and 3D preview screen, the part number must be fixed.
  • Please confirm the part number from "Specification / Dimension"on the left side, and then perform the CAD Data Download / 3D Preview operation.
Loading...
Part Number
P10-2GT-60-6
P14-2GT-60-6
P15-2GT-60-6
P16-2GT-80-6
P20-2GT-80-6
P25-2GT-80-6
P28-2GT-4-6F-AL-WA-H-[5,​6,​7,​8]
P28-2GT-6-6F-AL-WA-H-[5,​6,​7,​8]
P28-2GT-9-6F-AL-WA-H-[5,​6,​7,​8]
P28-2GT-80-6
P30-2GT-80-6
P32-2GT-4-6F-AL-WA-F-[5,​6,​7]-Z[7-9/1]-J[2-14/0.1]
P32-2GT-4-6F-AL-WA-H-[5,​6,​7,​8,​9]
P32-2GT-4-6F-AL-WA-P-[5,​6]
P32-2GT-4-6F-AL-WA-V-[5,​6,​7]-Z[7-9/1]-J[2-14/0.1]
P32-2GT-6-6F-AL-WA-F-[5,​6,​7]-Z[7-9/1]-J[2-16/0.1]
P32-2GT-6-6F-AL-WA-H-[5,​6,​7,​8,​9]
P32-2GT-6-6F-AL-WA-P-[5,​6]
P32-2GT-6-6F-AL-WA-V-[5,​6,​7]-Z[7-9/1]-J[2-16/0.1]
P40-2GT-4-6F-AL-WA-F-[6,​7,​8,​9,​10]-Z[8-13/1]-J[2-14/0.1]
P40-2GT-4-6F-AL-WA-H-[6,​7,​8,​9,​10,​11,​12,​13]
P40-2GT-4-6F-AL-WA-P-[6,​7,​8,​9,​10]
P40-2GT-4-6F-AL-WA-V-[6,​7,​8,​9,​10,​11]-Z[8-13/1]-J[2-14/0.1]
P40-2GT-9-6F-AL-WA-F-[6,​7,​8,​9,​10]-Z[8-13/1]-J[2-19/0.1]
P40-2GT-9-6F-AL-WA-H-[6,​7,​8,​9,​10,​11,​12,​13]
P40-2GT-9-6F-AL-WA-P-[6,​7,​8,​9,​10]
P40-2GT-9-6F-AL-WA-V-[6,​7,​8,​9,​10]-Z[8-13/1]-J[2-19/0.1]
P40-2GT-80-6
P44-2GT-9-6F-AL-WA-F-[6,​7,​8,​9,​10,​11,​12,​13]-Z[8-15/1]-J[2-19/0.1]
P44-2GT-9-6F-AL-WA-H-[6,​7,​8,​9,​10,​11,​12,​13,​14,​15]
P44-2GT-9-6F-AL-WA-P-[6,​7,​8,​9,​10,​11,​12]
P44-2GT-9-6F-AL-WA-V-[6,​7,​8,​9,​10,​11,​12,​13]-Z[8-15/1]-J[2-19/0.1]
P60-2GT-4-6F-AL-WA-F-[8-22/1]-Z[10-24/1]-J[2-14/0.1]
P60-2GT-4-6F-AL-WA-H-[8-24/1]
P60-2GT-4-6F-AL-WA-N-[8,​10,​11,​12,​13,​14]
P60-2GT-4-6F-AL-WA-P-[8-22/1]
P60-2GT-4-6F-AL-WA-V-[8-22/1]-Z[10-24/1]-J[2-14/0.1]
P60-2GT-6-6F-AL-WA-F-[8-22/1]-Z[10-24/1]-J[2-16/0.1]
P60-2GT-6-6F-AL-WA-H-[8-24/1]
P60-2GT-6-6F-AL-WA-N-[8,​10,​11,​12,​13,​14]
P60-2GT-6-6F-AL-WA-P-[8-22/1]
P60-2GT-6-6F-AL-WA-V-[8-22/1]-Z[10-24/1]-J[2-16/0.1]
P60-2GT-9-6F-AL-WA-F-[8-22/1]-Z[10-24/1]-J[2-19/0.1]
P60-2GT-9-6F-AL-WA-H-[8-24/1]
P60-2GT-9-6F-AL-WA-N-[8,​10,​11,​12,​13,​14]
P60-2GT-9-6F-AL-WA-P-[8-22/1]
P60-2GT-9-6F-AL-WA-V-[8-22/1]-Z[10-24/1]-J[2-19/0.1]
P72-2GT-80-6
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipBelt Width Used (mm)
(mm)
Number of Teeth
(T)
Pulley Shape Surface Treatment Shape symbol Shaft hole specifications

SGD 11.09

1 Piece(s) 53 Day(s) or more 6010Shape BNo6Pilot hole processing

SGD 11.09

1 Piece(s) 53 Day(s) or more 6014Shape BNo6Pilot hole processing

SGD 12.02

1 Piece(s) 53 Day(s) or more 6015Shape BNo6Pilot hole processing

SGD 12.02

1 Piece(s) 4 Day(s) or more 8016Shape BNo6Pilot hole processing

SGD 14.46

1 Piece(s) 4 Day(s) or more 8020Shape BNo6Pilot hole processing

SGD 19.51

1 Piece(s) 53 Day(s) or more 8025Shape BNo6Pilot hole processing

-

1 Piece(s) 13 Day(s) or more 428Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 628Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 928Shape BClear Anodize6FRound Hole

SGD 23.03

1 Piece(s) 53 Day(s) or more 8028Shape BNo6Pilot hole processing

SGD 25.32

1 Piece(s) 53 Day(s) or more 8030Shape BNo6Pilot hole processing

-

1 Piece(s) 13 Day(s) or more 432Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 432Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 432Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 432Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 632Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 632Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 632Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 632Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 440Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 440Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 440Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 440Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 940Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 940Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 940Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 940Shape BClear Anodize6FStepped hole

SGD 37.80

1 Piece(s) 4 Day(s) or more 8040Shape BNo6Pilot hole processing

-

1 Piece(s) 13 Day(s) or more 944Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 944Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 944Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 944Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 460Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 460Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 460Shape BClear Anodize6FNew JIS Keyway + Power Strip

-

1 Piece(s) 13 Day(s) or more 460Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 460Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 660Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 660Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 660Shape BClear Anodize6FNew JIS Keyway + Power Strip

-

1 Piece(s) 13 Day(s) or more 660Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 660Shape BClear Anodize6FStepped hole

-

1 Piece(s) 13 Day(s) or more 960Shape BClear Anodize6FStepped Hole (Boss Side Counterbore)

-

1 Piece(s) 13 Day(s) or more 960Shape BClear Anodize6FRound Hole

-

1 Piece(s) 13 Day(s) or more 960Shape BClear Anodize6FNew JIS Keyway + Power Strip

-

1 Piece(s) 13 Day(s) or more 960Shape BClear Anodize6FRound Hole + Tapping

-

1 Piece(s) 13 Day(s) or more 960Shape BClear Anodize6FStepped hole

SGD 94.07

1 Piece(s) 53 Day(s) or more 8072Shape BNo6Pilot hole processing

Loading...

  1. 1

Basic Information

Type Bar-Shaped Timing Pulleys Belt Series 2GT Material Aluminum Alloy
Pulley/Idler Pulley (No Bearing)

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)