(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Steel Pipe Fitting, Screw-in Pipe Fitting, Cross (Part Numbers)

Steel Pipe Fitting, Screw-in Pipe Fitting, Cross

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
BCR-1/2B-W
BCR-1B-W
BCR-2B-W
BCR-3/4B-W
BCR-3B-W
BCR-4B-W
BCR-11/2B-W
BCR-11/4B-W
BCR-21/2B-W
CR-1/2B-W
CR-2B-W
CR-3/4B-W
CR-3B-W
CR-4B-W
CR-11/2B-W
CR-11/4B-W
CR-21/2B-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment Band

SGD 7.54

1 Piece(s) 10 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 12.62

1 Piece(s) 10 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 39.36

1 Piece(s) 10 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 7.94

1 Piece(s) 10 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 92.50

1 Piece(s) 10 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 132.69

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 25.44

1 Piece(s) 4 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 19.73

1 Piece(s) 10 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 29.03

1 Piece(s) 10 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingPresence

SGD 8.90

1 Piece(s) 6 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 25.81

1 Piece(s) 6 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 10.66

1 Piece(s) 6 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 88.37

1 Piece(s) 6 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 132.69

1 Piece(s) 10 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 34.97

1 Piece(s) 6 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 26.18

1 Piece(s) 6 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

SGD 64.12

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc platingNo

Loading...

  1. 1

Basic Information

Connecting Shape Cross Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)