(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Saddle Clamp, Thick Saddle Bolt Hole (Electrogalvanized Plated / Stainless Steel) (Part Numbers)

Saddle Clamp, Thick Saddle Bolt Hole (Electrogalvanized Plated / Stainless Steel)

Saddle band for SGP pipe and the stainless steel pipe

[Features]
· Saddle band for SGP pipe.
· Bolt-fixture type with large holes.
· Can be installed on frames.
· Electrogalvanized finish.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
A10432-0014
A10432-0029
A10432-0033
A10432-0048
A10432-0052
A10432-0067
A10432-0071
A10432-0086
A10432-0103
A10454-0011
A10454-0026
A10454-0045
A10454-0050
A10454-0064
A10454-0079
A10454-0083
A10454-0098
A10454-0115
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Applicable Pipe Type Material Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 1.71

1 Piece(s) 6 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

SGD 1.86

1 Piece(s) 4 Day(s) or more 20~Less than 30[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

SGD 3.09

1 Piece(s) 4 Day(s) or more 30~Less than 40[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating25A134

SGD 3.31

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 3.68

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 2.38

1 Piece(s) 4 Day(s) or more 60~Less than 70[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating50A260.5

SGD 4.32

1 Piece(s) 4 Day(s) or more 70~Less than 80[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

SGD 4.47

1 Piece(s) 4 Day(s) or more 80~Less than 90[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating80A389.1

SGD 4.83

1 Piece(s) 4 Day(s) or more 100~Less than 200[Steel Pipe / Coated Steel Pipe] SGP PipeSteel[Zinc Plating] Electrolytic Zinc Plating100A4114.3

SGD 6.75

1 Piece(s) 7 Day(s) or more 20~Less than 30Stainless Steel PipeStainless SteelNo15A1/221.7

SGD 7.01

1 Piece(s) 4 Day(s) or more 20~Less than 30Stainless Steel PipeStainless SteelNo20A3/427.2

SGD 7.56

1 Piece(s) 4 Day(s) or more 30~Less than 40Stainless Steel PipeStainless SteelNo25A134

SGD 8.16

1 Piece(s) 4 Day(s) or more 40~Less than 50Stainless Steel PipeStainless SteelNo32A1 1/442.7

SGD 8.68

1 Piece(s) 4 Day(s) or more 40~Less than 50Stainless Steel PipeStainless SteelNo40A1 1/248.6

SGD 9.28

1 Piece(s) 4 Day(s) or more 60~Less than 70Stainless Steel PipeStainless SteelNo50A260.5

SGD 9.50

1 Piece(s) 7 Day(s) or more 70~Less than 80Stainless Steel PipeStainless SteelNo65A2 1/276.3

SGD 10.73

1 Piece(s) 7 Day(s) or more 80~Less than 90Stainless Steel PipeStainless SteelNo80A389.1

SGD 11.77

1 Piece(s) 7 Day(s) or more 100~Less than 200Stainless Steel PipeStainless SteelNo100A4114.3

Loading...

  1. 1

Basic Information

Type Saddle band Qty.(piece) 1

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)