(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) (A11212-0123)

Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) A11212-0123

Assembly-type Standing Band for SGP Pipe and Stainless Steel (Thick) Pipe

PDF

Japanese Only

Part Number

Configured Part Number is shown.

A11212-0123

 
Part Number
A11212-0123
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 30.18

1 Piece(s) 11 Day(s) or more 200~Less than 300[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Hot zinc plating (dip plating)200A8216.3

Loading...

  1. 1

Basic Information

Type Vertical band Qty.(piece) 1

Please check the type/dimensions/specifications of the part A11212-0123 in the Vertical Pipe Fitting Assembly-Type Standing Band (Electrogalvanized/Stainless Steel/Hot Dip) series.

Similar Part Numbers

Part Number
A10324-0017
A10324-0021
A10324-0036
A10324-0055
A10324-0060
A10324-0074
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Compatible Pipe Type Surface Treatment The size of diameter of steel pipe (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

SGD 0.83

1 Piece(s) 4 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

SGD 0.87

1 Piece(s) 4 Day(s) or more 20~Less than 30[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

SGD 0.89

1 Piece(s) 4 Day(s) or more 30~Less than 40[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating25A134

SGD 1.03

1 Piece(s) 10 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

SGD 1.14

1 Piece(s) 4 Day(s) or more 40~Less than 50[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

SGD 1.23

1 Piece(s) 4 Day(s) or more 60~Less than 70[Steel] Steel[Steel Pipe / Coated Steel Pipe] SGP[Zinc Plating] Electrolytic Zinc Plating50A260.5

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)