(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Suspended Piping Metal Fixture, with Galvanized Steel Sheet SP Suspension Tongue (Part Numbers)

Suspended Piping Metal Fixture, with Galvanized Steel Sheet SP Suspension Tongue

[Features]
· Lantern type hanging band for a spiral duct pipe.
· Set includes a "A10312 suspension tongue" with a with an "A10224 assembly type without SP suspension tongue."
· Made of molten zinc plated steel plate.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

A15517-0035

 
Part Number
A15517-0035
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Size Compatible Pipe Outer Diameter
(mm)

SGD 2.86

1 Piece(s) 4 Day(s) or more 100~Less than 200φ100103

Loading...

  1. 1

Basic Information

Type Hanging Band Material Steel Applicable Tube Type Spiral Duct Pipe
Surface Treatment Hot zinc plating Qty.(piece) 1

Please check the type/dimensions/specifications of the part A15517-0035 in the Suspended Piping Metal Fixture, with Galvanized Steel Sheet SP Suspension Tongue series.

Similar Part Numbers

Part Number
A15517-0016
A15517-0040
A15517-0054
A15517-0073
A15517-0088
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Size Compatible Pipe Outer Diameter
(mm)

SGD 3.78

1 Piece(s) 9 Day(s) or more 80~Less than 90φ7580

SGD 4.04

1 Piece(s) 7 Day(s) or more 100~Less than 200φ125128

SGD 4.06

1 Piece(s) 4 Day(s) or more 100~Less than 200φ150153

SGD 4.67

1 Piece(s) 9 Day(s) or more 100~Less than 200φ175178

SGD 6.57

1 Piece(s) 4 Day(s) or more 200~Less than 300φ200203

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)