(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pipe Fittings Assembly Flange

Pipe Fittings Assembly Flange

A plumbing fitting that uses a screw connection for small/medium-diameter steel pipes. Follows JIS B 2301 specification for a screw-type malleable cast iron pipe fitting. Hot zinc plating reduces effect on environment.

(i)Caution

  • Some of the items are scheduled to be discontinued as of end of March in 2023. The manufacturer keep the items produced but they are not available with Misumi.
    There are not the replacement items and the plan to resumption of sale. Please check the quotation and order screen for details.

PDF

Part Number

Configured Part Number is shown.

 
Part Number
F-10A-W
F-15A-B
F-15A-W
F-20A-B
F-20A-W
F-25A-B
F-25A-W
F-32A-B
F-32A-W
F-40A-B
F-40A-W
F-50A-B
F-50A-W
F-65A-B
F-65A-W
F-80A-B
F-80A-W
F-100A-B
F-100A-W
F-125A-W
F-150A-W
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Surface Treatment Tightening Bolt

SGD 19.09

1 Piece(s) 6 Day(s) or more 3/8B(10A)[Zinc Plating] Hot zinc platingM10

SGD 18.21

1 Piece(s) 5 Day(s) or more 1/2B(15A)[Not Provided] NoM10

SGD 18.21

1 Piece(s) 5 Day(s) or more 1/2B(15A)[Zinc Plating] Hot zinc platingM10

SGD 19.45

1 Piece(s) 5 Day(s) or more 3/4B(20A)[Not Provided] NoM10

SGD 19.45

1 Piece(s) 5 Day(s) or more 3/4B(20A)[Zinc Plating] Hot zinc platingM10

SGD 20.62

1 Piece(s) 5 Day(s) or more 1B(25A)[Not Provided] NoM10

SGD 20.62

1 Piece(s) 5 Day(s) or more 1B(25A)[Zinc Plating] Hot zinc platingM10

SGD 30.09

1 Piece(s) 5 Day(s) or more 1 1/4B(32A)[Not Provided] NoM12

SGD 30.09

1 Piece(s) 5 Day(s) or more 1 1/4B(32A)[Zinc Plating] Hot zinc platingM12

SGD 32.30

1 Piece(s) 5 Day(s) or more 1 1/2B(40A)[Not Provided] NoM12

SGD 32.30

1 Piece(s) 5 Day(s) or more 1 1/2B(40A)[Zinc Plating] Hot zinc platingM12

SGD 37.73

1 Piece(s) 5 Day(s) or more 2B(50A)[Not Provided] NoM12

SGD 37.73

1 Piece(s) 5 Day(s) or more 2B(50A)[Zinc Plating] Hot zinc platingM12

SGD 68.24

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)[Not Provided] NoM16

SGD 68.24

1 Piece(s) 6 Day(s) or more 2 1/2B(65A)[Zinc Plating] Hot zinc platingM16

SGD 75.87

1 Piece(s) 6 Day(s) or more 3B(80A)[Not Provided] NoM16

SGD 75.87

1 Piece(s) 6 Day(s) or more 3B(80A)[Zinc Plating] Hot zinc platingM16

SGD 110.41

1 Piece(s) 6 Day(s) or more 4B(100A)[Not Provided] NoM16

SGD 110.41

1 Piece(s) 6 Day(s) or more 4B(100A)[Zinc Plating] Hot zinc platingM16

SGD 206.80

1 Piece(s) 6 Day(s) or more 5B(125A)[Zinc Plating] Hot zinc platingM16

SGD 242.01

1 Piece(s) 6 Day(s) or more 6B(150A)[Zinc Plating] Hot zinc platingM20

Loading...

  1. 1

Basic Information

Connecting Shape Set flange Connection Type Flange Material FCMB27-05
Connection Thread Type M1 Rc Applicable Fluid Water / Air / Steam / Gas / Oil Type Fitting
Max. Operating Pressure(MPa) 2.5 Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)