(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Instead, please kindly use other browsers like Google Chrome, Microsoft Edge or Mozilla Firefox.

  • Scheduled Maintenance Notice: This site will be unavailable due to scheduled maintenance from 9:00 24/11/2024 to 7:00 (SGT) 25/11/2024. We apologize for the inconvenience.
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Guide Posts for Die Sets (BRPK25-130)

Guide Posts for Die Sets BRPK25-130

Click this image to zoom it.

Move the mouse over the image to zoom

  • Guide Posts for Die Sets
  • Guide Posts for Die Sets
  • Guide Posts for Die Sets
  • Guide Posts for Die Sets
  • Guide Posts for Die Sets
  • Guide Posts for Die Sets
  • On Sale Till 31/03/2025
  • Volume Discount

Guide post for die set. The material is bearing steel and the washer is carbon steel for mechanical structure. The tap on the tip of the post is different for the regular type, fixed stopper STK, and movable stopper STM.

Part Number

Configured Part Number is shown.

BRPK25-130

Part Number 

CAD Data download and 3D preview are not available because the part number has not yet been determined.

  • *In order to open the CAD Data download and 3D preview screen, the part number must be fixed.
  • Please confirm the part number from "Specification / Dimension"on the left side, and then perform the CAD Data Download / 3D Preview operation.
Loading...
Part Number
BRPK25-130
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSPost mounting methods Stopper systems of the retainer D (Post diameter)
(mm)
L (Length)
(mm)
Alteration LC (L dimension alteration)
(mm)

SGD 34.54

1 Piece(s)Available 5 Day(s) 10DetachableFixed stopper25130-

Loading...

  1. 1
 

Basic Information

Set/single item/accessory Post only

Please check the type/dimensions/specifications of the part BRPK25-130 in the Guide Posts for Die Sets series.

Similar Part Numbers

Part Number
BRPK20-80
BRPK20-90
BRPK20-LC101
BRPK25-80
BRPK25-90
BRPK25-LC101
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipRoHSPost mounting methods Stopper systems of the retainer D (Post diameter)
(mm)
L (Length)
(mm)
Alteration LC (L dimension alteration)
(mm)

SGD 25.57

1 Piece(s)Available 5 Day(s) 10DetachableFixed stopper2080-

SGD 25.57

1 Piece(s)Available 5 Day(s) 10DetachableFixed stopper2090-

SGD 35.53

1 Piece(s)Available 7 Day(s) 10Press fitFixed stopper20-101

SGD 32.22

1 Piece(s)Available 5 Day(s) 10DetachableFixed stopper2580-

SGD 32.22

1 Piece(s)Available 5 Day(s) 10DetachableFixed stopper2590-

SGD 42.84

1 Piece(s)Available 7 Day(s) 10Press fitFixed stopper25-101

Tech Support

Press
Tel:(65) 6733 7211 / FAX:(65) 6733 0211
9:00am - 6:00pm (Monday - Friday)